Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

SolarQuarter
solarquarter.com > 08/10/2026 > saudi-arabia-begins-commercial-operation-of-1-1-gw-al-henakiyah-solar-plant

Saudi Arabia Begins Commercial Operation Of 1.1 GW Al Henakiyah Solar Plant

49+ min ago   (288+ words) The plant is expected to generate enough clean electricity annually to meet the power requirements of around 190,000 households. With a capacity of 1.1 GW, the project adds significant renewable generation capacity to Saudi Arabia’s electricity system and supports the Kingdom’s broader…...

Google News
solarquarter.com > 08/10/2026 > gujarat-bess-seeks-scod-extension-liquidated-damages-waiver-for-180-mw-360-mwh-project

Gujarat BESS Seeks SCOD Extension, Liquidated Damages Waiver For 180 MW/360 MWh Project

4+ hour, 31+ min ago   (390+ words) Gujarat BESS Private Limited has approached the Gujarat Electricity Regulatory Commission (GERC) seeking an extension of the Scheduled Commercial Operation Date (SCOD) and a waiver of liquidated damages for its 180 MW/360 MWh standalone Battery Energy Storage System (BESS) project in…...

SolarQuarter
solarquarter.com > 08/10/2026 > ntpc-green-energy-wins-200-mw-800-mwh-bess-project-in-west-bengal

NTPC Green Energy Wins 200 MW/800 MWh BESS Project In West Bengal

2+ hour, 3+ min ago   (236+ words) NTPC Green Energy Limited (NGEL), a subsidiary of NTPC Limited, has secured a 200 MW/800 MWh standalone Battery Energy Storage System (BESS) project in West Bengal through a competitive e-reverse auction conducted by the West Bengal State Electricity Distribution Company Limited…...

SolarQuarter
solarquarter.com > 08/10/2026 > purvah-green-power-to-acquire-1-4-gw-renewable-energy-portfolio-from-renew-for-inr-4859-crore

Purvah Green Power to Acquire 1.4 GW Renewable Energy Portfolio From ReNew for INR 4,859 Crore

2+ hour, 24+ min ago   (266+ words) Purvah Green Power Private Limited, a subsidiary of CESC Limited, has entered into a Share Purchase Agreement to acquire 100% of the share capital of six renewable energy project companies from ReNew Solar Power Private Limited. The acquisition involves a combined…...

Google News
solarquarter.com > 08/10/2026 > gerc-approves-inr-4-87-kwh-tariff-for-torrent-powers-250-mw-fdre-procurement-in-gujarat

GERC Approves INR 4.87/kWh Tariff For Torrent Power???s 250 MW FDRE Procurement In Gujarat

4+ hour, 50+ min ago   (489+ words) The Gujarat Electricity Regulatory Commission (GERC) has approved a tariff of Rs 4.87 per unit for the procurement of 250 MW of Firm and Dispatchable Renewable Energy (FDRE) backed by Energy Storage Systems (ESS) by Torrent Power Limited (TPL). The order was…...

SolarQuarter
solarquarter.com > 08/10/2026 > waaree-renewable-technologies-secures-124-mwp-solar-epc-order

Waaree Renewable Technologies Secures 124 MWp Solar EPC Order

6+ hour, 17+ min ago   (140+ words) SolarQuarter Waaree Renewable Technologies Secures 124 MWp Solar EPC Order Waaree Renewable Technologies Limited (WRTL), a subsidiary of Waaree Energies Limited, has received a Letter of Award (LOA) to execute Engineering, Procurement and Construction (EPC) works for a 124 MWp (88 MWac) ground-mounted…...

SolarQuarter
solarquarter.com > 08/10/2026 > india-crosses-300-gw-non-fossil-fuel-capacity-surpasses-60-of-2030-target

India Crosses 300 GW Non-Fossil Fuel Capacity, Surpasses 60% Of 2030 Target

7+ hour, 10+ min ago   (329+ words) India has crossed a major milestone in its clean energy transition, with total non-fossil fuel-based installed electricity generation capacity reaching 300.50 GW as of July 31, 2026. The achievement puts India more than 60% of the way toward its target of installing 500 GW of…...

SolarQuarter
solarquarter.com > 08/10/2026 > creda-floats-inr-100-crore-tender-for-1000-off-grid-solar-power-plants-in-chhattisgarh

CREDA Floats INR 100 Crore Tender For 1,000 Off-Grid Solar Power Plants In Chhattisgarh

7+ hour, 47+ min ago   (380+ words) The tender covers off-grid solar systems equipped with LMLA and T-Gel battery banks and off-grid Power Conditioning Units (PCUs). Selected system integrators will be responsible not only for supplying and installing the systems but also for commissioning, insurance, repairs, maintenance,…...

SolarQuarter
solarquarter.com > 08/10/2026 > levanta-renewables-begins-construction-of-166-mwp-solar-bess-project-in-philippines

Levanta Renewables Begins Construction of 166 MWp Solar-BESS Project in Philippines

7+ hour, 48+ min ago   (190+ words) The project is being developed through Levanta Renewables’ project company, Magallanes Solar Energy Corp. Once operational, the facility is expected to generate approximately 261 GWh of electricity annually, enough to supply around 136,000 households. The project is also expected to avoid approximately…...

SolarQuarter
solarquarter.com > 08/10/2026 > first-solar-backs-us-section-232-measures-on-polysilicon-imports-citing-solar-supply-chain-security

First Solar Backs US Section 232 Measures on Polysilicon Imports, Citing Solar Supply Chain Security

7+ hour, 59+ min ago   (217+ words) First Solar, Inc.has expressed support for the Trump administration’s action under Section 232 of the US Trade Expansion Act concerning imports of polysilicon and its derivatives. The measure targets a critical input used in crystalline silicon solar modules. According to…...